The building of the 4 * hotel was designed with the architectural office ETC Architekci. NLA of the building is about 20 thousand. m2. The scope of projects includes: heating substation based on heat pomps , installation c.o., mechanical ventilation, air conditioning, fire ventilation, water and sewerage systems and installations.
Address: Białka Tatrzańska. Construction completed in 2019.